Intervention details

Intervention performed following the appearance of a fault code related to the anti-pollution system.

Diagnostic performed using a multi-brand diagnostic tool.

No active faults detected during the check.

Full SCR system test launched, along with a regeneration to verify that the entire anti-pollution system is functioning correctly.

Final check completed; no malfunctions found.

Parts replaced / intervention:

Electronic diagnostic performed

SCR system test performed

Regeneration performed


No parts replaced

  • files/IMG_2313.heic
  • files/IMG_2314.heic